| October 3, 2006
Met with the concrete flatwork crew this morning. Looks like the driveway, garage apron and front door walkway will be poured October 4. The apron will slope, and carry runoff, to the NW. |
| |
|
|
|
|
| 01.jpg | 02.jpg | 03.jpg | 04.jpg | 05.jpg |
| |
|
|
|
|
| 06.jpg | 08.jpg | 09.jpg | 10.jpg |