October 3, 2006
Met with the concrete flatwork crew this morning. Looks like the driveway, garage apron and front door walkway will be poured October 4. The apron will slope, and carry runoff, to the NW.

01 02 03 04 05
01.jpg 02.jpg 03.jpg 04.jpg 05.jpg
06 08 09 10  
06.jpg 08.jpg 09.jpg 10.jpg